Residential Targówek

smallimg1smallimg2smallimg3left-baner

Warsaw

 April 2018


 
targowek-2018
On 18.04.2018, IDS-BUD S.A. signed a contract on the performance of construction works for an investment entitled: “Modernisation of the Residential Targówek area within Ossowskiego Street, Handlowa Street, Myszkowska Street and Pratulińska Street"
targowek-2018-1
     
    The Contracting Entity is the Municipal Road Authority acting on behalf of the Capital City of Warsaw.
    Commencement date: until 18/04/2018
    Completion date: until 15/11/2018
     
    The contract includes designing and completion of construction works
     
    The subject of the Project is "Completion of construction works for an investment entitled "Modernisation of the Residential Targówek area within Ossowskiego Street, Handlowa Street, Myszkowska Street and Pratulińska Street"
     
    The scope of the investment includes:
    1. Construction of:targowek-2018-2
      1. Preparatory works:
        1. reinstatement of the route and elevation points,
        2. felling greenery which collides with the road,
        3. securing trees,
        4. stripping of topsoil,
        5. demolition of elements of roads and streets.
      2. Road works:
        1. reconstruction of the existing roads within the scope of the investment,
        2. reconstruction of intersections,
        3. construction of pavements, exits, bus bays,
        4. construction of surface and subsurface drainage systems.
      3. Trade works regarding road-associated facilities:
        1. construction of the rainwater sewage system,
        2. reconstruction of the water supply system,
        3. planting greenery,
        4. laying turf or growing grass,
        5. completion of traffic marking,
        6. reconstruction of road lighting,
        7. construction and reconstruction of electricity grids and devices,
        8. reconstruction of power lines,
        9. reconstruction of the water supply system,
        10. reconstruction of small architecture facilities and stop shelters.
    2. Completion and implementation of a permanent traffic system on sections of the reconstructed roads – traffic organisation and safety equipment.
    3. Completion and implementation of a temporary traffic system for the construction period (including ensuring access to all properties near the designed road for the entire term of construction).
    4. Restoration of the sites occupied by technical and social facilities, construction sites, access routes and any other sites modified by the Contractor in the course of the construction period and during removal of defects.
    5. Restoration of public roads used by the Contractor during the construction period to the standard from before the commencement of the construction works, in accordance with agreements between the Contractor and the Road Administrators.
    6. Drafting post-implementation documentation.
    7. Obtaining an occupancy permit.
     
    Realizacja: Informatikon