Construction of Pogórska Wola - Tworzeń gas pipeline DN 1000, MOP 8.4 MPA with auxiliary facilities and infrastructure required to operate it

smallimg1smallimg2smallimg3left-baner

Pogórska Wola - Tworzeń

 July 2019


 
podgorska wola
On July 2019, IDS-BUD S.A. signed a contract on the „Construction of Pogórska Wola - Tworzeń gas pipeline DN 1000, MOP 8.4 MPa with auxiliary facilities and infrastructure required to operate it, section 3 Braciejówka - Tworzeń”.
 
Ordering party : Gas Transmission Operator GAZ-SYSTEM S.A
 
General scope of the order:
 
The contract includes comprehensive execution of the Investment along with obtaining the permit for use.
The pipeline route will include:
  • 2 block and bleed system units, i.e.: ZZU Braciejówka and ZZU Nowy Ujków;
  • 33 underground drilling performed by trenchless methods (horizontal controlled drilling / microtunneling);
  • 2 underground pipelines in the Direct Pipe system from the length of 316 and 391 meters, respectively;
  • compensators.
The pipeline will pass the territories of the following municipalities: Olkusz, Klucze, Bolesław, Sławków, Dąbrowa Górnicza.
 
Time for completion: 28 months
 