Construction of 1000 MWe Power Unit at Ostrołęka C Power Plant

Ostrołęka

 2019

 

 
Investor: Elektrownia Ostrołęka C (Enea SA / Energa SA);
General Contractor: GE Power sp. z o.o.;
Civil Contractor: IDS-BUD SA;
 
Scope of works: Civil works for Power Island in the field of Turbine Hall and Central Electrical Building.
  • Turbine Hall: the scope of work includes insulation, reinforced concrete, masonry, finishing and indoor installation work;
  • The Central Electrical Building: the scope of work includes earthworks, insulation, reinforced concrete, masonry, finishing and indoor installation work;
 
For agreed scope of works there is about 28 000 cubic meters of concrete and about 3300 tons of reinforcement.
There is turbine hall foundation raft as the biggest element with volume about 9500 cubic meters, for which planned concreting can take about 4,5 days.
 
Similar object, it means reinforced concrete of the turbine hall with the turboset foundation, was performed by IDS-BUD for the biggest power unit in Poland, with the 1075 MW of electrical power at Enea Wytwarzanie sp. z o.o. at 2014-2016 years.
 